Tuesday, 5 May 2015

Week 9

Tuesday, May 5th 

Venue: INTI College Block A - Lvl 10 (Room15)
Time: 10:00AM – 11:00AM



This was our first project kickoff meeting with Collexe. This session was led off by Mr. Jess Tinawin who is our ER Senior Director at INTI Education Group who then handed us over to Collexe’s representative Mr. Irwin Cheong. There were several project title options available in hand but we scoped it down to two top projects that would most suit our technical capabilities. Mr. Irwin then briefed us on the project scope.

1.   The minutes gathered during our discussion today are:
·        Project: Inspection Management Program – Electronic tracking in-out system
·        Mission Critical Environment – Leave a trail of information
·        To control assignee(s) to carry out job tasks
·        Ultimate Goal: Make it mobile-friendly
·        Platform: VB.net & Mobile: Xamarin

2.   We also made arrangement for our next meeting (Checkpoint 1)
Scope which needs to be covered:
·        Action Plan – Initial Plan : Until this stage, no drafting is accepted
·        Present with timeline/Gantt Chart
·        Project Specifications – Provided by Collexe
·        Project Progress

3.   Target: Proposed design (Flowchart, picture diagram, UML diagram, low-fidelity interface-wireframe/high-fidelity)
·        Prepare action item for Checkpoint 2

Each email liaison sent to Ken & Alan and CC to all members of team, Ms.Robina & Mr.Rahulah.

Set schedule for the First Checkpoint:
Date: May 26th
Time: 10:00AM – 11:00AM
________________________________________________________

Wednesday, May 6th 
An arranged meeting via e-mail was carried out today. This meeting is supposedly for system demo to shed us some lights on their Facility Inspection System.

The next meeting was scheduled on:
Date: May 13th 2015
Time: 2:00PM – 4:00PM
Location: INTI College - Block A - Lvl 10 (Room 15)