Tuesday,
May 5th
Venue: INTI College Block A - Lvl 10 (Room15)
Time: 10:00AM – 11:00AM

This was our first project kickoff meeting
with Collexe. This session was led off by Mr. Jess Tinawin who is our ER Senior
Director at INTI Education Group who then handed us over to Collexe’s
representative Mr. Irwin Cheong. There were several project title options
available in hand but we scoped it down to two top projects that would most
suit our technical capabilities. Mr. Irwin then briefed us on the project scope.
1. The minutes gathered during our discussion
today are:
·
Project: Inspection Management
Program – Electronic tracking in-out system
·
Mission Critical Environment –
Leave a trail of information
·
To control assignee(s) to carry
out job tasks
·
Ultimate Goal: Make it
mobile-friendly
·
Platform: VB.net & Mobile:
Xamarin
2.
We also made arrangement for
our next meeting (Checkpoint 1)
Scope which needs to be covered:
·
Action Plan – Initial Plan :
Until this stage, no drafting is accepted
·
Present with timeline/Gantt
Chart
·
Project Specifications –
Provided by Collexe
·
Project Progress
3.
Target: Proposed design
(Flowchart, picture diagram, UML diagram, low-fidelity
interface-wireframe/high-fidelity)
·
Prepare action item for
Checkpoint 2
Each email liaison sent to Ken & Alan and CC to all members of
team, Ms.Robina & Mr.Rahulah.
Set schedule for the First Checkpoint:
Date: May 26th
Time: 10:00AM – 11:00AM
Time: 10:00AM – 11:00AM
________________________________________________________
Wednesday,
May 6th
An arranged meeting via e-mail was carried out today. This meeting
is supposedly for system demo to shed us some lights on their Facility Inspection
System.
The next meeting was scheduled on:
Date: May 13th 2015
Time: 2:00PM – 4:00PM
Location: INTI College - Block
A - Lvl 10 (Room 15)
No comments:
Post a Comment